GLASS BRIDGE
Saturday, September 30, 2006
to be completed by 4th quarter of 2006.
Glass Bridge will be suspended 4,000 feet above the Colorado River on the very edge
of the Grand Canyon. On May 2005, the final test was conducted and the stucture
passed engineering requirements by 400 percent, enabling it to withstand the weight
of 71 fully loaded Boeing 747 airplanes (more that 71 million pounds).
The bridge will be able to sustain winds in excess of 100 miles per hour from 8
different directions, as well as an 8.0 magnitude earthquake within 50 miles. More
than one million pounds of steel will go into the construction of the Grand Canyon
sky walk...
Labels: GLASS BRIDGE
posted by Ammie @ 1:31 AM,
3 Comments:
- At 2:36 PM, Keith said...
-
Pretty amazing specs... Can't wait to actually see it when it's finished...
- At 2:37 AM, said...
-
Oh geez. You can bet there's no way in hell anyone would get me on that thing.
- At 8:36 PM, said...
-
budget car insurance
buy car insurance online
car insurance dallas
car insurance coverage
state farm car insurance
car insurance houston
best car insurance
car insurance los angeles
infinity car insurance
car insurance rating
aaa car insurance
cheap car insurance quote uk
cheap car insurance for young driver
cheapest car insurance
geico car insurance
direct line car insurance
car insurance policy
car insurance uk
aa car insurance
california car insurance
aa car insurance
discount car insurance
geico car insurance quote
instant car insurance quote
teen car insurance
car insurance policy
auto insurance company
car insurance rats
auto insurance company
cheap car insurance uk
http://cheap-car-insurance.quickfreehost.com
Random Keyword: :)
geico car insurance